RSI Wind: Wind Turbines & Stealth Towers RSI Wind: Wind Turbines & Stealth Towers www.rsiwind.com

Photo Gallery

 

TechnoSpin

Kiowa WindGen at Sunset
TecnnoSpin Installation

Tower Construction: Drilling
TecnnoSpin Installation
Tower Construction: Base
TecnnoSpin Installation
Equipment
TecnnoSpin Installation
TechnoSpin
TechnoSpin
TechnoSpin
TechnoSpin
TechnoSpin
TechnoSpin
TechnoSpin
TechnoSpin

 

RSI Wind Out and About

RSI Wind at the 3i Tradeshow
RSI Wind at the 2010 3i Tradeshow
RSI Wind at the 3i Tradeshow
RSI Wind at the 2010 3i Tradeshow
RSI Wind at the 3i Tradeshow
RSI Wind at the 2010 3i Tradeshow
RSI Wind at the 3i Tradeshow
RSI Wind at the 2010 3i Tradeshow
RSI at PCIA 2009
RSI at PCIA 2009
RSI at PCIA 2009
RSI at PCIA 2009
NE Governor Dave Heineman at RSI Wind Display
Nebraska Governor Dave Heineman and the WindGen exhibitor's booth
RSI Wind at Husker Days
RSI’s WindGen Display at Husker Days Farm show
RSI Wind at Topeka Renewable Energy Conference 10-7-09
RSI Wind at Topeka Renewable Energy Conference 10-7-09
RSI Wind at Wichita Farm & Ranch Show 11-11-09
RSI Wind at Wichita Farm & Ranch Show 11-11-09
  RSI Wind at Wichita Farm & Ranch Show 11-11-09
RSI Wind at Wichita Farm & Ranch Show 11-11-09

 

Wind Turbines

WindGen interior
Interior of a Large Wind Turbine
Traditional Windmill Design
Traditional Windmill Design
Kiowa WindGen at Sunset Kiowa WindGen at Sunset
Kiowa WindGen at Sunset
Kiowa WindGen at Sunset
Kiowa WindGen at Sunset Kiowa WindGen at Sunset
Kiowa WindGen at Sunset Kiowa WindGen at Sunset
   

WindGen Construction

Tower Construction: Drilling
Construction: 10 foot by 24” Drill Footer
Tower Construction: Base
Construction: Base Bolt Layout Steel Jib Forms
Equipment
An “Off Grid WindGen” Battery Room
Climb Ladder
WindGen Climb Leg
Tower Parts
WindGen Tower Parts
Tower Parts
WindGen Tower and Head Wheel Parts
Shipping
The gen/set head and inverter building on a 40 foot
trailer ready for shipping.

Shipping
The gen/set head and inverter building on a 40 foot
trailer ready for shipping.

Large Turbine Construction
Large Turbine Construction

WindGen Construction

Base of tower
Base of tower
Tower being build on the ground
Tower being build on the ground
Gearbox install
Gearbox install
Top-end equipment
Top-end equipment
Lower-end equipment
Lower-end equipment
Wheel and gear box top-end
Wheel and gear box top-end
Completed unit ready for the crane to raise
Completed unit ready for the crane to raise
Completed WindGen
Completed WindGen